The Federal Government is set to partially close the Marine
Bridge in Apapa for another round of emergency rehabilitation.
Acting Federal Controller of Works in Lagos State, Forosola
Oloyede, said the rehabilitation is being done in phases.
Oloyede told the News Agency of Nigeria that worn out
expansion joints and bearings on the bridge would be replaced.
Also to be be repaired is the Corbel, the weight carrying
portions of a bridge built into the walls to absorb pressure of load.
The controller recalled that the last phased rehabilitation
was done between January and March.
“Now, we are going to close the Ijora bound carriageway on
the 20th of August and open it on the 20th of December”, Oloyede said.
She confirmed that the ministry had repaired alternative
routes “turning down to Mobil Filling Station and ramping up back to Marine
Bridge again.”
The Leventis to Navy Dockyard Road, ramping back to the
Marine Bridge, has also been fixed.
Oloyede assured that traffic architecture around all the
diversion points had been reviewed to ensure minimal discomfort to road users.
Advertise on NigerianEye.com to reach thousands of our daily users
No comments
Post a Comment
Kindly drop a comment below.
(Comments are moderated. Clean comments will be approved immediately)
Advert Enquires - Reach out to us at NigerianEye@gmail.com